Get your own free workspace
View
 

FrontPage

Page history last edited by Meenakshi 3 years ago

EEL 5881 - Software Engineering I, Spring 2009

 

Team Members (Team #4)

 

 

Project 2: First Hand News

Make a mashup driven by Yahoo Pipes or some similar technology to associate blog comments, flickr images, and other community driven sources of data with current news stories coming from a large news source like Google news. A system like this should be aware of the date and time of the news story, and show content submitted closer to that time first. It should also be aware that information significantly before the event or story in question are less likely to have anything to do with it.

 

Contact:Jimmy Secretan, School of EECS, University of Central Florida, Orlando, Florida, 32816-2362, Email: secretj@cfl.rr.com, Cell: 407-325-3581.

 


Project Deliverables

 

Deliverables Document Type Status Download Due Date Completed Date
Deliverable I    

 

 

   
  Concept of Operations Available Download 2/16/2009 2/05/2009
  Project Management Plan Available Download 2/16/2009 2/07/2009
  Software Requirements Specification Available Download 2/16/2009 2/12/2009
  Test Plan Available Download 2/16/2009 2/13/2009
  Presentation I Available Download 2/16/2009 2/13/2009
Deliverable II          
  High-Level Design Available Download 3/16/2009 3/12/2009
  Detailed Design Available Download 3/16/2009 3/12/2009
  Presentation II Available Download 3/16/2009 3/12/2009
Deliverable III (Final)          
  Test Results Available
Download 4/20/2009 4/17/2009 
  User's Manual Available
Download 4/20/2009 4/19/2009 
  Source Code Available
Download 4/20/2009 4/18/2009 
  Build Instructions Available Download 4/20/2009 4/19/2009 
  Project Legacy Available Download 4/20/2009 4/19/2009 
  Final Presentation Available Download 4/20/2009 4/19/2009 

 

Comments (0)

You don't have permission to comment on this page.